What are the requirements for crane hoisting work
What are the requirements for crane hoisting operations?
1. The personnel involved in lifting operations, including drivers, crane workers, signal commanders, electric welders, etc., should be special operations personnel, and must be personnel who have been professionally trained, evaluated and obtained a certificate, and confirmed by physical examination to be able to carry out high-altitude operations ;
2. Before lifting and hoisting operations, the site should be surveyed in detail, and a special construction plan should be prepared in accordance with the characteristics of the project and the operating environment, and approved by the technical person in charge of the enterprise. The content should include: site environment and measures, project overview and construction technology, crane machinery Selection basis, design and calculation of lifting poles, ground anchor design, design and selection of steel wire ropes and rigging, ground endurance and road requirements, component stacking in place diagrams, and various protective measures in the hoisting process, etc.;
3. The crane machine should be inspected and accepted after entering the site. The reassembled crane machine should be tested according to the regulations, including static load and dynamic load tests, and the sensitivity and reliability of various safety devices should be tested. After being assembled according to the plan, the squeegee should be tested by a test hoist, and it can be used only after it is confirmed to meet the requirements;
4. In addition to regular maintenance in accordance with regulations, automobile cranes should also undergo regular annual operation tests, including rated load and overload tests, to inspect their mechanical properties, structural deformation and load capacity. If they fail to meet the requirements, they should be reduced. Load use
5. Before using the hoisting rigging sling, check and accept one by one according to the design requirements of the construction plan;
6. The crane running road should be inspected, and paving measures such as subgrade boxes should be adopted when the ground endurance requirements are not met;
7. Hoisting materials for various protective measures, erection of scaffolding, and preparations for the enclosure of hazardous work areas should meet the requirements of the plan.