Safety knowledge of single-beam suspension cranes for high-altitude operations
1. All special equipment purchased, introduced, installed, and technically modified must comply with the relevant local national quality and technical supervision, safety and health regulations and standards, especially for the selection and purchase of dangerous cranes, the safety and equipment department must be obtained in advance Recognition.
2. When the purchased crane leaves the factory, it must pass the safety technical inspection of the local quality and technical supervision department, and obtain the "Crane Safety Technical Supervision Verification" and then be issued randomly.
3. The installation unit of hoisting machinery must obtain a qualification certificate, and the installer must have an operation certificate and work permit to engage in the installation of hoisting machinery and submit it to the superior safety and equipment department for review and filing.
4. Before the crane is delivered for trial operation, the installation unit must first perform self-inspection and fill in the self-inspection report, and submit it to the receiving unit for pre-acceptance (a complete record should be provided), and then the inspection and acceptance by the superior safety and equipment department will be approved. Can be put into trial operation.
5. The formal acceptance must be carried out in accordance with the management standard requirements of the superior technical, safety, and equipment departments.
6. Strengthen the management of cranes. Carry out the crane management system and safety inspection system carefully, do a good job of regular inspection, maintenance, and maintenance of the crane, eliminate hidden dangers in time, and keep the crane in good working condition.
7. Strengthen the education and training of crane operators, strictly implement safe operation regulations, and improve the ability of operation technology and the ability to deal with emergencies.