What are the procedures and documents required for the installation of gantry cranes?
Some customers who are going to install gantry cranes do not have a good understanding of what preparations to do. They want to know the inspection procedures and the documents that need to be prepared in the process. The editor will introduce the procedures and notifications for the installation of the gantry cranes. What documents are needed.
The gantry crane installation must be informed first
The general procedure is to first go to the Technical Supervision Bureau of the equipment installation site to go through the start notification procedures, and then wait for the gantry crane to be installed and debugged, and then apply for inspection and acceptance. If it is qualified, the certificate will be issued. The charging standards vary from place to place, depending on local conditions.
The generally required preparation materials are as follows:
1. “Installation Notification Application Form” filled out as required in triplicate (downloadable online)
2. The “Crane Installation Qualification” of the installation unit and the qualification certificate of the installer
3. The certificate, manual, work instruction, registration form and last inspection report of the crane to be installed
If the company is not too familiar with the inspection procedures, you can first go to the relevant local authorities to find out.
Generally, first go to the safety supervision section of the city-level quality and technical supervision bureau of the place where the installation is located to apply for installation supervision and inspection, and then go to the special equipment inspection station to apply for installation supervision and inspection. After the installation is completed, an inspection report and conformity mark must be obtained.
The manufacturer’s information needed for inspection application will be prepared for users when our crane equipment leaves the factory, so users don’t have to worry about insufficient information.
This is basically how we handle it, but the specific requirements vary from place to place, and some places are very troublesome! But generally it goes smoothly.