single girder overhead radio remote control bridge crane
LD model single beam motor crane is characterized by more reasonable structure and higher strength steel as a whole, used together with CD model electric hoist as a complete set, it is light duty crane with a capacity of 1 to 20 tons. The span is 7.5-28.5m. Working grade is A3-A4. Working temperature is -25°to 40°.
This product is widely used in plants, warehouse, material stocks to lift goods. It is prohibited to use the equipment in the combustible, explosive or corrosive environment.
This product has two operation methods, ground or operation room which has open model and closed model and can be installed on left or right side according to the practical situation. And the direction of entering the gate has two forms, sideway and ends on order to satisfy the user, choice under different conditions.
Advantages of Overhead Cranes are:
Can be used where overhead runways are not practical.
A much greater bridge weight than an equivalent overhead crane.
Overhead Cranes are generally used for moving heavy loads,often outdoors.Eternalwin has designed and built many large gantries with features such as rotating hoists, multiple hoists and enclosed cabs.
bridge crane main parameters
Lifting capacity | 10ton | ||
Lifting height | 20feet | ||
Span | 40feet | ||
Crane travelling mechanism | Working speed | 20m/min | |
Speed ratio | 58.78 | ||
Motor | Type | YSE80-4 | |
Power | 2*0.8 | ||
Rotational speed | 1380 | ||
Electric hoist mechanism | Model of electric hoist | CD | |
Lifting speed | 8m/min | ||
Lofting height | 20feet | ||
Travelling speed | 20m/min | ||
Motor | Con squirrel-cage model | ||
Working class | A3 | ||
Electric current | 240v60hz3p | ||
Wheel diameter | 270mm | ||
Crane total weight | 4.46t | ||
Max wheel pressure | 56.92 |
Bridge crane main parts
electric trolley
electric hoist
1. crane rated load capacity ?
2. the crane span ?
3. the crane lifting height ?
4. the working voltage ?
5. Do you need crane rail and bus bar ?
6. How many hours the crane working per day ?
7. the crane working environment ?
8. any other demands for crane ?
LINKS : Dongqi Crane