QDY metallurgy double girder overhead crane for smelting workshop
QDY series bridge metallurgy foundry crane has been widely used in the metallurgical industry, which is of great importance to deal with the complex environment of the metallurgical industry, reduce labor intensity and improve production efficiency.The main production workshops of metallurgical factories are equipped with all kinds of special bridge cranes specially designed for metallurgical process operation, which are usually installed and tested before the main process equipment is put in place.
metallurgy bridge crane is one of the main production equipment, smelting workshop in converter workshop with the crane will be shipped from blast furnace workshop of molten iron into the mixer to the mixer and the molten iron or shipped from blast furnace workshop of molten iron directly into the converter, the crane is equipped with independent drive, vice car, the car setting fixed spacing of Longmen hook, lifting ladle. The auxiliary trolley can be used to tilt the steel bucket or do other auxiliary lifting operations. The crane adopts a closed slant rail box girder, so it has good vertical and horizontal rigidity.
Lifting Capacity | T | 5 | 10 | 16/3.2 | 20/5 | 32/5 | 50/10 | 74/20 | |
Span | m | 10.5-31.5 | |||||||
Speed | Main Hook Lifting | m/min | 15.5 | 10.4 | 10.7 | 9.8 | 7.8 | 7.8 | 6.1 |
Aux. Hook Lifting | 14.6 | 15.5 | 15.5 | 10.4 | 9.7 | ||||
Traveling of Trolley | 37.2 | 43.8 | 44.6 | 44.6 | 42.4 | 39.3 | 33.8 | ||
Crane travelling | 92.7/93.7 | 92.7/93.7 /86.5 | 76/89 | 76/89 | 89/75.3 | 75/76.6 | 67.3 | ||
Operational Model | Cabin | ||||||||
Working Duty | A7 | ||||||||
Power Supply | Three-phase A.C. 380V, 50Hz or customized |
LINKS : Dongqi Crane