Lifting capacity of single girder overhead crane
After the single-beam crane lifting limiter device is installed, the corresponding alarm scale fixed load should be set. This method is nothing more than suspending the load of a similar alarm weight on a single-beam crane, hoisting the goods off the ground, and turning the load control button on the dashboard until the flashing alarm signal is announced.
Secondly, adjust the potentiometer button of the digital instrument to display the number or text equivalent to the actual lifting weight of the single-beam crane, and set the additional load in the same way. When the single beam crane is overloaded, it can quickly block the ascending loop and power supply. After adjusting the potentiometer buttons, they should be locked immediately, and the buttons should be sealed with paint. Do not turn the buttons for special adjustments.
The single-girder overhead crane was originally a new product developed by the introduction of German equipment. It has the advantages of novel structure, application, simplicity, flexible use, and large operating space. This machine is energy-saving and efficient material-improving transportation machinery, which can be widely used in factories, mines, busy production lines, tooling supporting lines, etc., machine tools and heavy objects are hoisted and transferred at the warehouse wharf.